Sarv Office Building / Tamouz Architecture & Construction Group

Disorder/Order – Scattered/Arranged – Unorganized/Organized – Not seeing/Seeing – Unseen/Seen – Shade/Light – Closed/Open – Shell/Space. These opposing concepts were central to the design challenges faced by the Sarv administrative building project. Initially referred to the design team in June 2017 for façade approval, the building posed unique architectural problems. It was a partially constructed structure with 100% plot coverage, limiting the potential for natural light and ventilation to just one side—the southern façade. This constraint heavily influenced the design team's approach, as they sought to balance functional requirements with aesthetic and spatial considerations.

Oct 23, 2024 - 11:00
Sarv Office Building / Tamouz Architecture & Construction Group
Disorder/Order – Scattered/Arranged – Unorganized/Organized – Not seeing/Seeing – Unseen/Seen – Shade/Light – Closed/Open – Shell/Space. These opposing concepts were central to the design challenges faced by the Sarv administrative building project. Initially referred to the design team in June 2017 for façade approval, the building posed unique architectural problems. It was a partially constructed structure with 100% plot coverage, limiting the potential for natural light and ventilation to just one side—the southern façade. This constraint heavily influenced the design team's approach, as they sought to balance functional requirements with aesthetic and spatial considerations.

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow